Natural Gas Pipeline

Eskipazar-Karabük and Zonguldak-Caycuma-Bartin Natural Gas Pipeline

 

Client: BOTAŞ 

108,3 km 16" 16,7 km 14" 45,8 km 12"

Total: 170.8 km

  • 3 ea 16" Line Valve
  • 1 ea 16" Take-off Valve
  • 2 ea 12" Take-off Valve
  • 1 ea 12" Line Valve Valve
  • 1 ea 10" Take-off Valve
  • 1 ea 6" Take-off Valve
  • 1 ea 16" Pig Receiver Station
  • 1 ea 16" Pig Launcher Station
  • 1 ea 12" Pig Receiver Station
  • 1 ea 40.000 m3 / h RMS A Reducing and Measuring Station
  • 1 ea 60.000 m3 / h RMS A Reducing and Measuring Station
  • 1 ea 10" Take-off Valve (Low Pressure)
  • 2 ea 8" Take-off Valve (Low Pressure)
  • 1 ea 6" Take-off Valve (Low Pressure)
  • 2 ea 15.000 m3 / h MS B Measuring Station
Natural Gas Pipeline
Natural Gas Pipeline
Natural Gas Pipeline
Natural Gas Pipeline
Natural Gas Pipeline
Natural Gas Pipeline
Natural Gas Pipeline
Natural Gas Pipeline
Natural Gas Pipeline
Natural Gas Pipeline
Natural Gas Pipeline
Natural Gas Pipeline
Natural Gas Pipeline
Natural Gas Pipeline
Natural Gas Pipeline
Natural Gas Pipeline
Natural Gas Pipeline
Natural Gas Pipeline