• 36”x36”x36” hot-tap operation, 1 36” hot-tap valve and the area where the hot-tap operation will be carried out to provide connection at a suitable point at approximately KP 101+900 KM of the existing 36 inch diameter Antalya Natural Gas Loop Line Starting with the installation of the initial pig station (40” Aşağıoba Pig (Half Pig Unit – Bidirectional / Thrower and Receiver) and 36” Hot-Tap Valve Station), which will be built to cover the KP 0+000 point of the Natural Gas Pipeline will be considered)
• 40 inch Gebiz Line Valve Station to be constructed at approximately KP 27+454 (horizontal distance),
• 40 inch Akbaş Line Valve Station to be constructed at approximately KP 53+421 (horizontal distance),
• 40 inch Çolakli Line Valve Station to be constructed at approximately KP 79+342 (horizontal distance),
• 40 inch Manavgat Line Valve and 8 inch Manavgat City Take-Off Valve Station to be constructed at approximately KP 100+547 (horizontal distance),
• 40 inch Karakaya Pig (Full Pig Unit – Duplex / Thrower and Receiver) and 40 inch Karakaya Line Valve Station to be constructed at approximately KP 131+420 (horizontal distance) point,
• At the exit of the wire fence of the 40 inch Kayabaşı Line Valve Station and Kayabaşı Line Valve Station to be constructed at approximately KP 158+823 (horizontal distance), 40” pipe will be capped at a suitable point (this point is Manavgat-Alanya-Gazipaşa-Anamur Districts Phase-1 Natural Gas The pipeline system of approximately 158,823 meters (horizontal distance) and 40 inches diameter high pressure natural gas steel pipeline system consisting of material supply, installation and construction works to be terminated (to be considered as the Pipeline end point),
consists of construction works.